The blinker situation has been all sorted out, with the blinkers mounted to the carbon fiber headlamp brackets, and the headlamp mounted with titanium bolts and drilled titanium washers. Additionally, many of the older corroded bolts have been replaced with stainless steel bolts, bought on the cheap from MonsterParts.
Stuart is going to help by putting on a new set of Michelin Pilot Roads, since the Vegas trip is 2800mi and my rear Pilot Power is looking pretty worn already (not to mention the aged Dunlop out front). He's going to give the bike a once over before the ride after I change my oil, and afterward he'll likely do an oil change, belt change, and valve check. If the valves need any tending to, I will be putting in a MBP collet set, and using the EMS Shims. Other bits include Nichols Flywheel and the Nichols Jambnuts for good insurance, as well as the Sil Moto Spaghetti Headers. Things are looking good, though I dread the upcoming wiring debacle that will be installing an AutoCom system to a switched positive lead. Here's a shot of the whole bike currently before the work begins:
Higher quality pictures will be taken next time, when I'm back to using my Canon SLR, rather than my Blackberry Bold.