Still on the project M900W, the next element to sort out was the fuel system. The previous owner had really messed this up. I gutted the entire assembly and installed new fuel lines, a quick disconnect by the tank, a new fuel filter, a Pingel manual petcock, a new Mikuni vacuum fuel pump, and lastly pulled the already equipped Keihin FCR 41 carbs and thoroughly cleaned them.
This segment does not yet have a happy ending, as the electrical system was in even worse shape, so there was no chance of a test fire just yet.
The wiring harness had been cut through as if a kindergartner had been let loose on it with a pair of non-safety scissors. The taillight and turnsignal wiring was in shambles. Luckily, over the Christmas holidays, my father felt sorry for the poor bike's ugly wiring and sprung for Rizoma signals, which I believe he got from PJ's Parts. After some cutting, some soldering, some crimping, and some posi-locks, things are almost wired up. I still had a MotoLED tail light board from the M900V leftover when I upgraded to the Vizi-Tec system, so in it went as well. The tail was further chopped to accommodate a TPO taillight / license plate kit.
A Shorai battery just arrived from Motowheels, and I am excited to install it in the bike. But before a test of the bike can be performed, the electrical circuits must be reviewed again - the regulator had another ground wire coming off of it and running down the frame to the original battery location, and the fusebox contained all 30A fuses! These things will be remedied before its set in motion, and the regulator may be preemptively replaced/upgraded as well!
Other things done: All controls mounted on new handlebar (previous owner had poorly thought out clip-on installation), fresh oil, oil filter, oil cooler lines, bled hydraulics and put in new brake pads (will be upgraded masters to radial SBK masters with folding levers, purchased but not yet installed)
What's left to do? Tires, Chain, Clutch pack, install frame and rear axle sliders, CA-Cycleworks Exact-Fit Coils, sort out the remaining wiring, install shock and hoop, fill it up with gas, and hopefully ride off!
10 February 2011
M900W - Fueling
Labels:
CA-Cycleworks,
Carbon Fiber,
DesmoWorks,
Keihin,
M900W,
Motowheels,
Pingel,
PJsParts,
Rizoma,
Shorai